Pressure testing machine,Universal testing machine,Constant stress pressure testing machine
· Liquid crystal display (LCD) universal testing machine series
· Liquid crystal display four pillar series universal testing machine
· The screen microcomputer universal testing machine series
· Display four pillar series microcomputer universal testing machine
· Microcomputer electro-hydraulic servo universal testing machine series
· Four pillar series microcomputer electro-hydraulic servo universal testing machine
A, An overview of the
Mainly used in brick, stone, cement and building materials such as concrete compressive strength measurement. The machine adopts hydraulic loading, the electronic load, with digital display, the peak load automatic printing, etc.
This machine is advanced technology, value, high sensitivity, good stability, the new structure. Is the building materials, construction, highway, railway, bridge construction and other units of necessary inspection equipment.
B, Installation, commissioning, maintenance
1.Testing machine should be installed in a clean, dry, temperature uniformity, no vibration, no corrosion gas impact of the lab.
2.Installation site location should be adapted to, should be easy to operation and maintenance, installation of foundation should be solid and reliable, and around the machine should be kept off the wall 800 ~ 1000 mm, so that the operation and maintenance.
This machine can be directly placed on the ground can also be installed on the solid concrete platform as shown in figure 3
3.Tester level adjustment, with 0.10/1000 mm level measurement cylinder mesa, vertical and horizontal level + lattice (or oblique pad iron pad under the base adjustment), good correction.
4.Oil used oil is different due to the different climate, now recommend oil specification is as follows: when the environment temperature of 15 ℃ + 5 ℃ recommended n46 GB433-84 hydraulic oil, when the environment temperature 28 ℃ + / - 5 ℃ n68 GB433-84 hydraulic oil as recommended.
5. When refueling after opening the cover plate, unscrewed the tank of fuel cap an amount will be subject to the oil standard (about 7 to 8 kg). Use after a period of time as found oil turbidity should be replaced. When changing unscrewed the tank bottom plug can drain the oil and add new oil into kerosene fuel tank for cleaning, and then released. So after a few repetitions, oil with a towel, at the bottom of adding new oil.
6.The machine should be kept clean inside and outside surface of unprotected often should besmear antirust oil, should be cut off power supply when not in use with hood to cover up.
7. Installing a power supply, power supply should be paid attention to, whether the voltage is normal, three-phase ac voltage can not lack of phase. Double color line must be grounded line, not the zero line. Open the power supply before, shall confirm the correct wiring.
8. Printer paper, the instrument will not be able to control print, please click the printer manual for printer paper again.
9.This machine is high precision instruments and equipment, maintenance, and shall have the professional personnel in charge and precision and check according to certain cycle. If found to have abnormal situation should be shutdown check immediately. Such as major issues of the system should be please repair professional and technical personnel.
C, The main technical parameters
SKZY-2000 |
Pressure testing machine |
Digital display level |
All rights reserved: wuxi city construction test instrument equipment co., LTD
Telephone: 400-860-8085 400-860-8085 Fax: 0510-8507-2875
Address: south long area in wuxi city, jiangsu province famous high-tech industrial park area C 31-1
The ICP registration number: zhejiang ICP for 05002238
Tech support: the league of network resources